M.C. CONSULTING
“Quality Communication
Consultations”
Consulting Team # 4 Report Form
Report # 4
Team
Name: B.A.J.L Consulting Report
Date: September 18, 2007 Meeting
Dates/Times Since Last Report: 3 (Class and Lab Times)
Member
Absences: Brittany Miller
Summary of
What Was Discussed / Work Done: In this lab, the three of us planned out what will be discussed and
presented in two weeks to Chet. We have decided that Assignments for Future Work / Deadlines: Next week,
we will be meeting in lab with all of our sections of our paper done to the
best of our ability. We will need to send them to Amy on Sunday so she can
arrange the written material into a pitch paper for Chet. She will give us
her finished product on Monday, where Brittany, Jim, and I will be meeting to
go over all of the work which was done. Having this done will be very
beneficial on Tuesday because we will then have an easier time to make our
Powerpoint presentation and what each of the group member will be saying
during the presentation in two weeks. Our Assessment of Our Teamwork and Task Progress
(Strengths and Weaknesses): I believe the group has been working very well with one another in the
past week. We have come to decisions as a group and all offer very valuable
information in the process of establishing a positive work environment. I still
see mostly strengths in this group because everyone has been offered positive
feedback to the overall group’s progression. If someone perhaps missed a
class period or lab, they have properly contacted the rest of the group of
their absence and asked for work to do because he or she was gone. Submitted by:
Louie Saccomando |